# UNCOVER HIDDEN FINANCIAL RISKS:

## How AI Revolutionizes Constructability Reviews for Modern Construction

---

## Underdeveloped design sets and quick starts are a fact of life in constructability reviews and risk analysis.

If processes were not so time-constrained, **nearly all major design**  
**and construction problems could be caught long before hard**  
**hats hit the site.**

However, current practices aren’t designed for meticulous issue  
identification. Instead, teams do the best they can, constrained  
by time and resource deficiencies. This leaves design clashes and  
conflicts to be resolved during construction.

While many factors are to blame for this inefficiency, the primary  
problem is that reviews are still done manually. Preconstruction  
teams often follow a lengthy checklist or lead page-turn sessions  
that consume valuable time.

It’s time to unwind the old rules of constructability reviews and  
stop accepting dated processes as “good enough.” **The pace of**  
**construction — and the financial risk involved — demands it.**

---

# Risk Management

# Begins with Better Constructability Reviews

Turning design into reality comes with risk. It’s up to general  
contractors to proactively identify that risk whenever and  
wherever possible as they review plans for constructability.  
By doing so, they can:

• Prevent cost overruns  
• Promote better safety  
• Maintain predictable schedules  
• Build better relationships with clients  
• Reduce exposure to safety and design issues  
• Optimize resource allocation  
• Reinforce their reputation

While risk reduction has always been important, it’s even more  
critical today. As margins grow slimmer and labor becomes  
harder to find and keep, construction projects become  
increasingly complex and involve more stakeholders. This  
combination **amplifies the likelihood of design conflicts,**  
**scheduling delays, and other unforeseen issues.**

“On top of this, there’s so much information GCs don’t have  
when they’re preparing to bid on a project,” explains Holly  
Cindell, construction industry veteran and Firmus team  
member. “For instance, plans may not specify beam sizes or  
column placements. Routing or space coordination for MEP  
systems may not be outlined. Gaps like this leave GCs to make  
assumptions. And assumptions mean increased risk.”

So, how can GCs reduce risk during constructability review?  
While there are many ways, **integrating AI into the mix can**  
**transform the process significantly.**

---

# Reimagining Reviews: Traditional vs. AI-Driven Methods

Let’s say you have one month to review a design,  
create a comprehensive and accurate bid, and  
outline a to-do list for your operations team.

Which of the following approaches are you going  
to take?

---

## OPTION 1: Manual Constructability Review

“During a manual review, humans will miss things,” says  
Cindell. “Most teams don’t have the capacity to look at  
everything. They review key pieces and hand it off. Everything  
else is dealt with later.”

A manual constructability review can take two to three weeks  
(or longer), as teams:

• Physically review drawings, specifications, and schedules  
to pinpoint problems, hazards, and discrepancies  
• Conduct meetings to review some documents line by  
line to ensure alignment  
• Ensure material availability  
• Coordinate across disciplines to identify clashes  
between systems  
• Flag items that require follow-up or resolution

---

## OPTION 2: AI-Powered Constructability Review

When AI enters the picture, this process doesn’t  
disappear — but it can be done better and faster.

Project team members can return to higher-value  
work while an AI design review and risk analysis tool  
completes tedious tasks, scanning hundreds of  
drawing sheets to identify incomplete designs, scope  
gaps, missing information, and discrepancies.

“AI looks through the minutiae, resulting in the creation  
of data on what is not in alignment,” says Cindell.  
“Then you decide which issues you care about — and  
what actions to take. You take the data and findings  
from AI, add to them the experience and knowledge  
brought by humans, and you have an accelerated  
review in a few hours with software. This would take  
weeks for a person to finish.”

Humans are still involved, but they’re **decision-**  
**makers and problem-solvers, not data processors**  
**and box-checkers.**

---

**When we learned about**  
**using AI to take care of**  
**low-hanging fruit, it was**  
**the first step to formalize**  
**our constructability**  
**review program.**

*— Michael Thole, Director of Corporate*   
    *Quality Services, Flintco*

## A Real Story on Making the Decision to Implement AI

For Michael Thole, Director of Corporate Quality Services at  
Flintco, the answer to reducing risk during constructability  
reviews was found in AI. Firmus is one of many tools the general  
contractor uses to reduce risk.

“Previously, we operated with a manual process that wasn’t  
driven by design releases but by availability of key staff,” says  
Thole. “It was a page-turn review by our Preconstruction team  
and members of the Operations staff.”

To improve the process, Flintco transitioned the leadership  
and facilitation of constructability reviews to its Quality  
Assurance department. Within that group, a Design Quality  
& Constructability sub-team, comprised of subject-matter  
experts across disciplines, was established to evaluate  
technical aspects of the design.

“These changes made it a much more collaborative and robust  
process, but it was still focused on manual effort when it came  
to reviewing documentation,” explains Thole. “We wanted  
to better understand and mitigate the risks associated with  
a project before we mobilized in the field. **Changes were**  
**occurring too late when they could’ve been addressed as a**  
**design comment during preconstruction.** When we learned  
about using AI to take care of low-hanging fruit, it was the first  
step to formalize our constructability review program.”

---

# How AI Can Help You Minimize Risk

During constructability reviews, AI acts as another  
engineer. It lets you explore potential issues — including  
those that are often overlooked — earlier than traditional  
methods allow.

“As a general contractor, our job is to understand how  
we can manage and mitigate risk not only for us but also  
for our clients,” Thole explains. “Information gathered  
during constructability reviews puts us in the best  
position to propose the right control measures and  
sure the best outcomes for everyone.”

By expanding your reach across critical constructability  
elements, AI helps manage risks proactively for you —  
and your clients.

---

## Move from Low-Value Tasks to High-Impact Work

Using AI in preconstruction helps you harness the  
abilities of your workforce. You can empower your team  
to **focus on high-value activities like decision-making,**  
not low-value tasks like data collection. They get to  
direct their energy toward tasks that require expertise:  
refining proposals, collaborating with stakeholders,  
developing action plans, and solving efficiency issues.  
This shift not only maximizes productivity but also  
ensures that their valuable skills are utilized.

## How does this manage risk?

Increasing task throughput makes projects  
resilient to delays, cost increases, and operational  
challenges. More buffers can be in place to handle  
unanticipated disruptions.

---

## Spot Issues in Hours, Not Weeks

Constructability issues spread across thousands of pages can  
be detected with AI and presented along with detailed reports  
that describe potential clashes within hours. Packages can  
be verified for compliance before submission to minimize the  
back-and-forth that delays approval.

Case in point: Questions can be answered without RFIs —  
before the first submittal package comes in. Take doorframes  
as an example. On a 1,000-door job, assume AI uncovers 100  
issues to address.

“Typically, a submittal would be developed with a list of  
questions that need to be answered,” says Cindell. “That  
takes two to four weeks to develop. If those questions can  
be answered right away, you get early-delivery items, such as 
doorframes, to the jobsite on time so you aren’t hit with a fee  
for every doorframe that isn’t there when work begins.”

## How does this manage risk?

Saving time creates efficiencies. When AI automates and  
streamlines critical preconstruction tasks, your team no longer  
spends valuable hours on manual reviews.

---

## Detect Hidden Design Flaws Before They Escalate

When teams are pressed for time, they may skip  
mundane (yet important) tasks. This can come  
back to haunt them later, creating millions of  
dollars’ worth of delays and rework.

## With AI in the picture, nothing has to be  
**deprioritized.** Minor data points can be reviewed  
and passed along to operations team members  
so they can continue to provide value later in the  
project lifecycle.

## How does this manage risk?

Having details upfront helps you avoid unknowns  
and minimizes downstream delays and confusion.  
Teams can prioritize, delegate, and simplify  
workflows to improve efficiency.

---

## Use Unbiased Data to Identify Gaps

AI-powered platforms allow preconstruction teams to  
**batch RFIs with markups** that call attention to what’s  
missing or incorrect. These gaps aren’t based on a  
personal analysis conducted by Bob in the back office but  
on objective data.

This encourages faster RFI response, especially because  
the project team recognizes that the information is  
unbiased. This also allows more people to get involved  
in this process without being a project manager,  
construction manager, or architect.

## How does this manage risk?

All decisions and actions are based on data-backed  
evaluations instead of experiences or assumptions.  
Because teams are working together, there are fewer  
errors to contend with.

---

## Reveal Safety Risks Sooner

Sometimes discrepancies aren’t about design clashes —  
they’re about safety.

During a recent remodel of a two-tenant building, the  
project team planned to retain an existing wall as a  
load-bearing structure. But Firmus uncovered an item  
that resulted in the project team reviewing the area and  
discovering that the wall could not support the load.  
In other words, **an AI comment on an inconsistency**  
**uncovered a major structural issue.**

## How does this manage risk?

Identifying and resolving safety risks early reduces the  
likelihood of accidents or failures during construction.  
It also gives you time to adjust plans and reallocate  
resources to fix problems faster.

---

## Deliver Reliable and Accurate Bids

With AI, you can be sure that design-phase project  
documentation is reliable and accurate. Teams can **confidently**  
**create cost estimates** without worrying about changes that  
may require significant updates or corrections later.

“We’ve also been able to identify and mitigate risks that need to  
be addressed with trade partners before pricing,” says Thole.  
“We can explain to clients why we’re suggesting certain risk  
controls in our proposal. It becomes a real benefit for us to say,  
‘This is why these things are included in your estimate.’ Before,  
we didn’t have formal documentation to rely on.”

## How does this manage risk?

You and your clients can be sure the bids are realistic and  
dependable. This prevents errors, miscalculations, and  
budget overruns.

---

## AI Is Your Partner, Not Your Replacement

AI is not a replacement for your team members. It’s a  
tool that helps them do their jobs faster. (It’s like using a  
nail gun instead of a hammer.)

---

“It took a while for people to adapt to CAD and BIM too,  
but the industry made the transition,” Cindell points  
out. “People weren’t replaced by that technology.  
They transitioned to another type of role or took on  
more work. While AI can help you advance, it will never  
replace your experience.”

Change may be scary, but it’s also inevitable. At some  
point, your company will be left with no choice but to  
pivot. When your team’s constructability review drags  
on for weeks, while your competitors finish theirs in a  
few days, what will your strategy be?

“To get used to the idea, we focused on the fact that  
AI simply supplements the constructability review  
process,” says Thole. “From a capacity standpoint,  
it frees us up to focus on the technical and detailed  
aspects of design and risk management. We had  
enthusiastic individuals and innovators on our team, but  
they weren’t always the ones who made the business  
decision to apply these tools. We had to win those  
people over.”

To accomplish that, engagement and change  
management strategies work well.

---

## Understand AI’s True Capabilities

Make sure everyone understands what the tool will do (process  
large datasets, identify risks, and flag potential conflicts) and  
wouldn’t do (provide a final solution). Because it’s AI, it will  
neither be perfect nor replace human roles.

Teams need to learn to **trust but verify**. While the tool delivers  
insights, humans need to make sure the insights align with the  
project — and determine the relevancy of the issues identified  
so a course of action can be taken.

“Even when you do 100% coordination with BIM, you still go out  
in the field to verify that it’s all going to work. The same holds  
true here,” says Cindell.

---

## Start with Trial Runs

Develop a pilot plan so workers know when, where,  
and how the tool will be implemented. As success  
stories roll out, **share the wins internally** so  
everyone can see the impact.

Build an internal vetting board or advisory group to  
ensure successful implementation. Members can  
offer advice on how to tailor the tool for efficiency,  
offer diverse perspectives on how it can be used,  
and cultivate buy-in.

---

## Don’t Forget About Security

As you bring on AI tools, talk about how you’ll protect  
your company, your clients, your business partners,  
and your data. When you choose new partners,  
**understand how they manage and maintain data**  
within their platforms. Be comfortable with their  
process before you come to an agreement.

## Decide When and Where to Use It

Think about where you want to deploy the tool. “**Not**  
**every tool will work for every sector** or every type  
of project,” explains Thole. “We learned that Firmus  
works best for us on high-rise projects where the  
floor plan is similar across several stories. There’s  
lots of iteration that the program can benefit and  
learn from quickly.”

---

# Will You Help Drive Progress or Stall Growth?

“Regardless of what you believe about working with  
AI, it’s not going away,” advises Cindell.

“You can be part of the process, or you can be a  
roadblock. You’re better off getting on board to  
help guide and construct it so it can be the tool you  
want. It’s no different from when the industry put  
a computer on every engineer’s table. This is just a  
different kind of tool.”

---

## Firmus

Firmus is the market leader in  
preconstruction AI design review  
and risk analysis.

Its easy-to-use platform enables general  
contractors, developers, and AEC stakeholders  
to detect and mitigate design issues early.  
Adopted by some of the largest construction  
and design-build firms in North America,  
Firmus increases efficiency and bid accuracy  
while mitigating risk. Securely managed from a  
single cloud-based platform, Firmus provides  
the most reliable and cost-effective design  
review AI in the industry.